Título: Ensemble lagged forecasts of a monsoon depression over India using a mesoscale model
Ensemble lagged forecasts of a monsoon depression over India using a mesoscale model
Autores: CHANDRASEKAR, A.
KUMAR, VINOD
Fecha: 1969-12-31
Publicador: Revistas UNAM
Fuente:
Tipo:

Tema: Ensemble; MM5; depression
;ENSEMBLE; MM5; DEPRESSION
Descripción: A monsoon depression formed over the Bay of Bengal, India, during 27 July 1999 and crossed the east coast of India on 28 July 1999. The system caused copious rainfall over the east coast of India and adjacent regions and is investigated in this study using ensemble lagged methods with the Pennsylvania State University/National Center for Atmospheric Research (PSU/NCAR) Fifth Generation Mesoscale Model (MM5). Two sets of experiments are designed with five members of ensembles in each set starting at 12 UTC 25 July 1999 and at preceding times separated by 3 hour intervals. In the first experiment, the National Center for Environmental Prediction (NCEP) reanalysis data is utilized in the forecast of a coarse grid spacing domain and subsequent nest down to a finer (30 km) grid spacing domain. In the second experiment, the NCEP reanalysis data is directly utilized in the 30 km domain as initial/boundary conditions. The results of the ensemble average of both experiments are compared with the analysis and observations. It is found that at the initial times of verification, the ensemble average of the sea level pressure field corresponding to the second experiment has a larger horizontal structure and is more closer to NCEP reanalysis. However at later times of verification, the ensemble average of sea level pressure field corresponding to the first experiment is found to be better. The area averaged 24 hour accumulated precipitation of all the ensemble members have higher values corresponding to the first experiment as compared to the second experiment. Also, the spread of the area averaged 24 hour accumulated precipitation of all the ensemble members with respect to their respective ensemble average are higher for the first experiment as compared to the second experiment. The results of the study would be useful to operational weather forecasting centers in India as it would provide them different evaluating ways to develop and test the importance of ensembles.  
DURANTE EL 27 DE JULIO DE 1999 SE FORMÓ UNA DEPRESIÓN MONZÓNICA SOBRE LA BAHÍA DE BENGALA, INDIA, QUE CRUZÓ LA COSTA ESTE DEL PAÍS EL 28 DE JULIO DEL MISMO AÑO. EL SISTEMA OCASIONÓ LLUVIAS ABUNDANTES SOBRE LA COSTA ESTE Y REGIONES ADYACENTES Y ES INVESTIGADO EN ESTE TRABAJO UTILIZANDO MÉTODOS DE ENSAMBLE RETRASADOS CON EL MODELO DE MESOESCALA DE QUINTA GENERACIÓN (MM5) DE LA PENNSYLVANIA STATE UNIVERSITY Y EL NATIONAL CENTER FOR ATMOSPHERIC RESEARCH (PSU/NCAR). SE DISEÑAN DOS GRUPOS DE EXPERIMENTOS CON CINCO MIEMBROS DE ENSAMBLES CADA UNO EMPEZANDO EL 25 DE JULIO DE 1999 A LAS 12 UTC CON INTERVALOS SUBSIGUIENTES DE 3 HORAS. EN EL PRIMER EXPERIMENTO SE UTILIZAN LOS DATOS DEL REANÁLISIS DEL NACIONAL CENTER FOR ENVIRONMENTAL PREDICTION (NCEP) PARA EL PRONÓSTICO DE UN DOMINIO DE MALLA GRUESA Y UN ANIDAJE SUBSECUENTE A UN DOMINIO DE MALLA MÁS FINO (30 KM). EN EL SEGUNDO EXPERIMENTO LOS DATOS DEL REANÁLISIS DEL NCEP SE UTILIZAN DIRECTAMENTE EN EL DOMINIO DE 30 KM COMO CONDICIONES INICIALES Y DE FRONTERA. SE ENCUENTRA QUE EN LOS TIEMPOS INICIALES DE VERIFICACIÓN, EL PROMEDIO DEL ENSAMBLE DEL CAMPO DE PRESIÓN AL NIVEL DEL MAR CORRESPONDIENTE AL SEGUNDO EXPERIMENTO TIENE UNA ESTRUCTURA HORIZONTAL MÁS GRANDE Y ES MÁS CERCANO AL REANÁLISIS DEL NCEP. SIN EMBARGO, SE ENCONTRÓ QUE EN TIEMPOS POSTERIORES DE VERIFICACIÓN EL PROMEDIO DEL ENSAMBLE DEL CAMPO DE PRESIÓN AL NIVEL DEL MAR ES MEJOR EN EL PRIMER EXPERIMENTO. TODOS LOS MIEMBROS DEL ENSAMBLE DEL PRIMER EXPERIMENTO TIENEN VALORES MAYORES EN EL ÁREA PROMEDIO DE PRECIPITACIÓN ACUMULADA DE 24 HORAS QUE LOS DEL SEGUNDO EXPERIMENTO. ASIMISMO, LOS VALORES DE LA DISPERSIÓN DE TODOS LOS MIEMBROS DEL ENSAMBLE DEL PRIMER EXPERIMENTO PARA EL ÁREA PROMEDIO DE PRECIPITACIÓN ACUMULADA DE 24 HORAS SON MAYORES QUE LOS DEL PROMEDIO DE SU RESPECTIVO ENSAMBLE EN EL SEGUNDO EXPERIMENTO. LOS RESULTADOS DE ESTE ESTUDIO PUEDEN SER ÚTILES PARA LOS CENTROS DE PRONÓSTICO OPERATIVO DEL TIEMPO EN LA INDIA, YA QUE PUEDEN PROPORCIONAR DIFERENTES MANERAS DE DESARROLLAR Y PROBAR LA IMPORTANCIA DE LOS ENSAMBLES.
Idioma: Español

Artículos similares:

Ordered Hunt Schemes for Overlaid CDMA Cellular Systems,Esquemas de ordenamiento en sistemas celulares sobrepuestos CDMA por Castañeda Camacho, J; Benemérita Universidad Autónoma de Puebla, Puebla, México,Lara Rodríguez, D; IPN
Model for Adjustment of Aggregate Forecasts using Fuzzy Logic,Modelo para el ajuste de pronósticos agregados utilizando lógica difusa por Escobar Gómez, E N; Instituto Tecnológico de Tuxtla Gutiérrez Chiapas,Díaz Núñez, J J; Universidad Autónoma de Ciudad Juárez Chihuahua,Taracena Sanz, L F; Instituto Tecnológico de Querétaro, Querétaro
Volatile Organic Compound Emissions from Light-Duty Vehicles During Cold-Starts,Emisiones de compuestos orgánicos volátiles durante arranques en frío de automóviles ligeros por Mendoza Domínguez, A; Tecnológico de Monterrey, Campus Monterrey, Nuevo León, México,León Romero, M A; Tecnológico de Monterrey, Campus Monterrey, Nuevo León, México,Caballero Mata, P
Matrix Formulation of Foundations for Vibrating Machinery in Frequency Domain,Formulación matricial de cimentaciones para maquinaria vibratoria en el dominio de la frecuencia por Carbajal Romero, M F; Instituto Politécnico Nacional. México DF,Rodríguez Castellanos, A; Instituto Mexicano del Petróleo. México DF,Rodríguez Sánchez, J E; Instituto Mexicano del Petróleo. México DF,Flores Méndez, E; IPN
Hydrogen Sorption Properties of the Intermetallic Mg2Ni Obtained by Using a Simoloyer Ball Milling,Propiedades de ab-desorción de hidrógeno del intermetálico Mg2Ni obtenido empleando un molino de bolas Simoloyer por Martínez Franco, E; IPN,Klassen, T; GKSS, Research Center Geesthacht, Germany,Jaramillo Vigueras, D; IPN,Bormann, R; GKSS, Research Center Geesthacht, Germany
Numerical Approach to an Outflow Hydrograph of a Dambreak,Estimación numérica del hidrograma de salida de una presa debido a su ruptura por Fuentes Mariles, O A; Universidad Nacional Autónoma de México,Arganis Juárez, M L; UNAM,De Luna Cruz, F; UNAM,Franco, V; UNAM
Electrical Parameters Extraction of CMOS Floating-Gate Inverters,Extracción de parámetros eléctricos de inversores CMOS de compuerta flotante por Molinar Solís, J E; Universidad Autónoma del Estado de México,Ponce Ponce, V H; IPN,García Lozano, R Z; Universidad Autónoma del Estado de México,Díaz Sanchez, A; Instituto Nacional de Astrofísica, Óptica y Electrónica INAOE,Rocha Pérez, j M; Instituto Nacional de Astrofísica, Óptica y Electrónica INAOE
Back Work Ratio of Brayton Cycle,La relación de trabajo de retroceso de un ciclo Brayton por Malaver de la Fuente, M; Universidad Marítima del Caribe, Venezuela
Active Rectifier with Extended Functions: An Option to Voltage Sags Ride Through and Power Quality Improvement,Rectificador activo con funciones ampliadas: una alternativa para la compensación de sags de voltaje y mejorar la calidad de la red eléctrica por Núñez Gutiérrez, C A; Universidad Autónoma de San Luis Potosí, SLP,Lira Pérez, J; Universidad Autónoma de San Luis Potosí, SLP,Pazos Flores, F; Universidad Autónoma de San Luis Potosí, SLP,Echavarría Solís, R; Universidad Politécnica de Victoria, Ciudad Victoria, Tamaulipas
10