Colección: TEMAS

Temas Cantidad
750kV substation; redundant protection; fault diagnosis; redundant knowledge representation; time sequence fuzzy Petri Net1
Conventional Synchronous Reluctance motor; Four switch inverter; Vector control, Maximum torque control; Hysteresis current controller; Saturation and iron losses.1
Electric Vehicle1
Electric Vehicle charging;power grid1
Electrical12
OFDM, CFO estimation, CS-based channel estimation.1
asynchronous traction motor;inverse decoupling control;nonlinear ;zero dynamics1
distribution network; network reconfiguration; principle; algorithm1
substation secondary equipment;status assessment; FC-SVM; analytic hierarchy process;Kernel function1
virtual baseline; resolving ambiguity; phase difference; outliers1